21 · Practical appendices

Appendix: physical and financial calculation dictionary

Document canonical factors, units, savings and cost outputs

148 pages · Edition 2026-10-10

Practical appendices

A reproducible canonical electricity balance and valuation guide

Publish the instrument and its replication boundary

The technical appendix defines the retained calculation as a reproducible instrument. It accepts a complete annual electricity input object, validates the schema and measure identities, computes sequential states, and returns physical, economic and diagnostic output. The same canonical module is used by the Studio and the research reproducer. The manuscript does not implement a competing spreadsheet or Python transition model. Retained inputs and complete outputs permit another analyst to reconstruct the exact conditional calculation while keeping parameter validity and field performance as separate questions.

The input contract is more precise than a form label. Every required field has a numerical or structural type, an allowed range and a declared unit. Measure names must be unique within the package. Unknown fields are rejected rather than silently interpreted as additional model features. Missing fields, nonfinite values and values outside the supported numerical precision are errors. A legitimate zero remains a supplied value; a missing energy, price or cost does not become zero. The exported machine-readable schema is retained with the study files, and its identity is checked against the catalogued app schema.

The measure array supplies the state-transformation order. Each measure reduces the demand remaining at that step by its supplied percentage, then adds its supplied electrical demand. Its renewable quantity increases the cumulative annual supply available in the screen. The quantity used is capped at current demand, and grid energy supplies the remainder. The resulting emissions and energy cost follow the respective supplied factors and prices. This interpretation is central to replication: the percentage does not automatically apply only to a particular device, and the supplied renewable quantity is not necessarily the amount used after the cap.

The baseline state uses the supplied annual demand on the grid basis before listed measures. Incremental abatement compares the emissions immediately before and after a measure. Incremental energy-cost saving compares the corresponding energy expenditure. The measure cost combines equivalent annual capital, its supplied continuing expenditure and its energy-cost saving. The package comparison instead relates the final state to the baseline and includes all listed capital and continuing costs. These reference states should be retained when selecting an output pointer; a measure increment and a package result are different quantities.

The financial convention is a constant annual benefit with upfront capital. The discounted annuity factor converts that annual benefit over the supplied horizon and rate. At a zero supplied rate the factor uses the horizon directly, which avoids a spurious division problem. The package NPV applies that factor to net annual savings and subtracts total listed capital. Annualised net cost converts capital to an equivalent annual amount and subtracts the same annual saving. These are compatible descriptions of the retained simplified case. Neither includes debt, tax, commissioning, replacement or a time-varying benefit path.

Evidence and scope

Analytical assurance tests fitness for purpose and supporting evidence.

Evidence: The AQuA Book

Illustrative calculation. Assumptions and sensitivity are published with the model.

The retained instrument identity

The version is selected from the canonical frozen output. Source-byte and schema receipts retain the implemented instrument used for the illustrative studies.

Scroll for all columns. With the table focused, use the left and right arrow keys.

The retained instrument identity
Identity fieldRetained value
Canonical model version1.1.1
Paired computationstudio/apps/transition-lab/index.js::compute
Machine-readable contractmodels/input.schema.json
Input identity checkExported canonical schema equals the catalogued app schema.

Canonical foundation output identity. A version identifier is metadata rather than a claim of performance or acceptance.

Illustrative calculation. Assumptions and sensitivity are published with the model.

Complete foundation global inputs

These fields reproduce the foundation screen. Their values are illustrative supplied assumptions, with no actual location, meter history, tariff or financing quote.

Scroll for all columns. With the table focused, use the left and right arrow keys.

Complete foundation global inputs
Input fieldSupplied valueUnit and interpretation
baselineEnergy10,000.00MWh/year annual reference electricity.
gridFactor0.60tCO2e/MWh supplied grid attribution.
renewableFactor0.02tCO2e/MWh supplied additional-renewable attribution.
gridPrice120.00USD/MWh flat energy charge.
renewablePrice80.00USD/MWh flat charge on energy used.
horizon12.00Years in the constant-flow valuation.
discountRate8.00% per year supplied discount convention.

Canonical foundation input scalar pointers. Rates are supplied percentages; factor and price bases retain their screening meanings.

Illustrative calculation. Assumptions and sensitivity are published with the model.

Complete foundation measure inputs

The row order is part of the input. Every supplied energy quantity is annual, capital is upfront and operating expenditure is continuing.

Scroll for all columns. With the table focused, use the left and right arrow keys.

Complete foundation measure inputs
NameEfficiency, %Added demand, MWh/yearSupply, annual MWhCapital, USDOpex, USD/year
Demand efficiency20.000.000.00800,000.0010,000.00
Supplied annual renewable energy0.000.004,500.001,800,000.0030,000.00

Canonical foundation measure input pointers. Renewable quantities are additional supply, not an already capped output.

The abatement-cost metric is defined when its computed annual abatement denominator is strictly positive. A small positive denominator produces a ratio and can magnify uncertainty in the inputs; there is no additional positive cutoff. A zero or negative denominator produces an unavailable ratio. In that case the frozen output retains null, and the publication renders it as not defined. The result must not be replaced by a numeric zero or sorted as a free reduction. A negative net cost with positive abatement is a different case: it indicates a conditional annualised saving per attributed reduction. The technical distinction is preserved in the small-denominator and zero-denominator studies.

The reverse diagnostic runs the same supplied measures in reversed order and returns final demand, emissions and NPV. It does not return a full reversed incremental ledger or a reversed package-abatement field. The manuscript therefore selects only quantities actually present in that diagnostic when reporting it. It does not invent a missing scalar through a separate calculation. The diagnostic can reveal a scope interaction, but it does not test feasibility of either order. Engineering must interpret whether a percentage can affect the demand introduced by another measure.

The built-in sensitivity tests retain the physical package and use the supplied prices, common price-level alternatives and a reduced grid-factor alternative. Both energy prices move together in the price-level tests, while measure operating expenditure remains supplied. The factor test changes grid attribution without changing price. These are deterministic selected conditions. They contain no assigned likelihood, forecast call or global optimisation. A relative-price change, such as the separately retained adverse-price study, is a distinct authored input case and should be described as such.

Warnings identify numerical interpretations that need attention. A measure with nonpositive incremental abatement has no meaningful reduction-cost ratio. Annual supply beyond demand receives no export revenue or extra emissions credit. A supplied renewable factor above the grid factor can make displacement adverse under the retained basis. A reversal that changes the physical result points to a sequential scope assumption. Warnings are part of the complete output, but their absence does not establish field feasibility or recognised reporting. A user should retain the method limits alongside every case.

The output has several representations of the same conditional state. Top-level fields support exact scalar bindings, measure records support the sequential ledger, and tables and metrics support readable app output. The research bindings select scalar input or output pointers and attach them reciprocally to published blocks. Reproduction recomputes the complete output before checking the selected claims. This prevents a paper from preserving only favourable summaries while the runnable case has changed. The ledger is an evidence link, not an independent source of truth that can override the canonical computation.

Select the output that answers the question

The dictionary distinguishes physical state, comparison and valuation fields. It supports pointer selection without introducing an alternate calculation. Original output-reading guide. Units follow the canonical engine and retained field meanings.

Scroll for all columns. With the table focused, use the left and right arrow keys.

Select the output that answers the question
Output groupQuestion answeredLimit to retain
energy, gridEnergy, renewableEnergyWhat is the final annual electricity state?No hourly or complete multi-carrier operation.
curtailedRenewableWhat supplied annual energy lies beyond the used demand cap?No export, storage or paid-surplus treatment.
emissions and abatementWhat is the final attribution and baseline difference?Supplied factor basis, without reporting certification.
measure abatement and incrementalCostWhat changes relative to the preceding supplied state?Sequence and affected-demand interpretation remain attached.
annualSavings and npvWhat is the constant energy-related cash screen?No liquidity, debt or full lifecycle cash schedule.
packageMacWhat is annualised net cost per positive annual reduction?Unavailable when the denominator condition fails.
reverse and sensitivityWhat happens under selected deterministic challenges?No probability, forecast or optimal package claim.

Replicate first, then challenge meaning

The reader opens the retained complete input and checks its schema and measure order. The canonical module recomputes the output, which is compared with the frozen output before any result is interpreted. Each printed scalar is checked against its input or output pointer and unit. The reader then tests the assumptions relevant to the decision, preserving the distinction between a changed input, changed method and changed operating question. Invalid input is corrected explicitly. A reproducible output can still have unsupported parameters, so applied use proceeds to the relevant engineering, commercial and reporting evidence rather than stopping at arithmetic agreement.

Verification combines exact reproduction with independent expected cases and invariants. Hand-selected physical expectations test demand, grid and renewable allocation, emissions direction, curtailment and supplied annual cash arithmetic. A zero-rate financial boundary tests the constant-benefit identity without constructing a competing discount model. Conservation, nonnegative used quantities and unavailable-ratio conditions test relations across outputs. Invalid and incomplete inputs test that errors remain errors. The paired overlap and reversed-demand checks test different sequence consequences. These checks improve confidence in the conditional engine while remaining separate from evidence that any fixture describes a real facility.

The retained figures use output pointers for every plotted coordinate. Deterministic drawing changes only coordinate scale and typography; it does not recompute transition economics. Adjacent specifications allow the audit to redraw the figures and compare their assets and scalar claims. Connectors between stages or selected tests organise the points and retain explicit reading limits. They do not add uncomputed intermediate states, probability curves or schedules. A reader should use the accompanying tables for exact values and the figure for the relationship it is designed to expose.

Fit an applied question to the instrument by tracing it through the available fields. A supported annual demand, factor basis, price and measure sequence can populate the retained screen. A duty-specific load interaction, payment for unused nominal supply or time-critical resilience objective needs a representation the screen does not provide. Identify that mismatch before entering a convenient substitute value. Preserve the complete input for replication and the omitted-mechanism explanation for interpretation. If another method is necessary, disclose its own basis and reproducibility separately. The calculation dictionary enables this fit test without treating a structurally valid input as evidence that the applied question has been answered.

Exact reproduction can create false confidence

A reader can correctly object that matching frozen output merely proves consistency with the same instrument, not truth of the model. That is why the verification record includes independently expected fields, physical invariants, boundary cases and error behaviour, and why the manuscript separates parameter evidence from computational checks. Those tests can still miss defects or inappropriate use. Independent review should challenge both the implementation and the fit to the decision. Reproduction is a necessary traceability layer for the published results, but it does not establish engineering validity, causal savings or reporting acceptance.

The technical contract preserves the annual electricity scope

The retained schema and code govern the supported bounds and precision. The appendix describes their meaning without extending the input model to fuel, heat quality, temporal operation, contractual instruments, taxes, carbon income, debt, degradation or replacement. No alternative finance or emissions pipeline is implemented in the author scripts. The illustrative inputs remain fictional and the complete outputs remain conditional. A real decision requires an appropriate wider method where the omitted mechanism is material, along with verified data and authority for the statement being made.

Evidence at the point of use

Open a citation in the chapter to inspect its source, stated support and limits.