Research replication

Corridors are systems

Open the exact fictional inputs behind each worked study. Project cases use their companion model; auxiliary cash bridges retain a separate, verifiable calculation.

Return to the paper

These are illustrative scenarios, not actual project or supplier data. Inputs and method boundaries govern each result.

Illustrative study

Illustrative base chain

Locate the annual serial constraint and explain whole-chain cost allocation on delivered throughput.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative vessel-loading intervention

Expand the visible waterside asset while holding the binding inland stage unchanged.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative rail intervention

Relieve the original rail constraint and reveal the next binding loading stage.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative coordinated intervention

Expand rail and vessel loading together and identify the newly binding stockyard.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative lower rail availability

Change availability alone to expose calendar sensitivity and fixed-cost dilution.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative lower demand

Reverse the capacity interpretation by making demand lower than every effective stage capacity.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative tied serial constraints

Show why single-stage improvement can fail when another stage shares the same effective capacity.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Illustrative unavailable loading stage

Test the boundary where annual flow vanishes and unit cost is undefined while fixed obligations remain.

What changes

  • Variable: Nominal capacity, availability or demand as explicitly changed by this fixture
  • Held constant: All other frozen inputs; operating costs are held constant solely to expose throughput and denominator effects
  • Interpretation: Compare the full slate including coordinated, lower availability and lower demand. These are deterministic contrasts, not probability bounds.

Limits of the study

  • Explicitly fictional corridor with annual steady-state serial flow; no route, queue, dispatch, inventory, seasonality or quality model.
  • Operating cost assumptions remain unchanged across physical interventions; this is not a capital appraisal and does not establish feasible improvements, investment return or accepted service.
Open this case in the model

Illustrative study

Distinct binding capacities at a supported small scale

Test whether binding membership changes incorrectly when units become small.

What changes

  • Change: Multiply demand and both capacities by the same positive scalar within their declared bounds.
  • Held constant: Availability, stage order and zero operating costs.
  • Interpretation: The capacity ordering and binding stage must be invariant; this is a computational diagnostic, not an actual operating forecast.

Limits of the study

  • Extremely small quantities are deliberately fictional computational probes, not economically meaningful cargo estimates.
  • Exact rational comparisons concern the supplied canonical decimal values; they do not establish availability accuracy or feasible expansion.
Open this case in the model