Skip to content
ICM Holdings International
Search⌘ K
Index

Evidence observatory

Follow a claim to its source.

Inspect authority, edition, support boundaries and linked research locations. A retrieval record describes what was checked at the time; it is not a claim of continuous live validity.

The evidence fieldIllustrative composition
Illustrative evidence arrangement. Source authority, edition and support boundaries remain visible in the records below.

Interactive controls require JavaScript. With it enabled, they become available after the library loads. The papers and reading links remain available.

Sourced supports a statement within the source scope.

Derived follows a stated calculation.

Assumed is a premise to challenge.

Illustrative explains a mechanism.

121 source records.

wb-finance-issues

Key Issues in Developing Project Financed Transactions

World Bank PPP Resource Center

Distinguishes periodic debt-service coverage from cash available over the loan life. Financing terms depend on the transaction's cash-flow risks.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Debt Service Cover Ratio; Loan Life Cover Ratio
Support boundary
Definitions and financing logic only. Examples of leverage on the page are not current market benchmarks and are not used as such.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-finance-structures

Finance Structures for PPP

World Bank PPP Resource Center

Explains recourse to a sponsor balance sheet versus a project company and the alignment of debt service with project cash flows.

Edition and access
live guidance, accessed 2026-10-12 · Accessed 2026-10-12
Locator
Non-recourse project finance for PPPs; Alternatives to non-recourse project finance
Support boundary
A financing structure is not proof of bankability, legal effectiveness or off-balance-sheet accounting.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-project-concepts

Project Finance: Key Concepts

World Bank PPP Resource Center

Describes a special-purpose project company, subcontracted delivery and the absence of operating revenues during new-build construction.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Typical project finance structure
Support boundary
Do not repeat the page's broad off-balance-sheet claim as an accounting conclusion. Contractual and accounting outcomes require transaction-specific analysis.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-bankability

Considerations for Government

World Bank PPP Resource Center

Links bankability to debt-service confidence, viability and allocation of risks affecting cash flows.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Bankability
Support boundary
No universal debt-coverage threshold is supplied or inferred. A hypothetical model cannot establish lender willingness.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-risk-allocation

Risk Allocation

World Bank PPP Resource Center

Identifies currency mismatch and interest-rate variation as mechanisms that can make debt service unaffordable.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Currency risk; interest rate risk
Support boundary
Some reference-rate examples are historical. Cite mechanisms rather than treating named benchmarks as current loan terms.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-risk-identification

Identifying Risks

World Bank PPP Resource Center

Organises project risks by mechanisms including construction, demand, operations, finance and legal change.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Economic or financial; legal or regulatory
Support boundary
A list of possible risks supplies no empirical event frequency or project-specific probability.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-credit-enhancement

Third Party Risk Mitigation and Credit Enhancement

World Bank PPP Resource Center

Explains how guarantees, public capital and other support can change risk allocation and financing conditions.

Edition and access
live guidance, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Credit enhancement and public support
Support boundary
Credit support creates obligations and conditions; it does not eliminate the underlying physical or commercial risk.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

epec-guide

EPEC Guide to Public-Private Partnerships

European Investment Bank, European PPP Expertise Centre

Provides a framework for preparing, procuring and delivering PPPs. Distinguishes value for money from affordability.

Edition and access
2026 edition, 16 April 2026 · Accessed 2026-10-10
Locator
Printed pages 9, 15, 44 and 182; physical PDF pages 17, 23, 52 and 190: lifecycle, affordability, funding and value for money.
Support boundary
A public-sector PPP framework is adapted here as a comparison lens; it is not a universal private investment rule.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifc-project-finance

Project Finance in Developing Countries

International Finance Corporation

Defines debt-service coverage using cash available for a specified service period and distinguishes economic viability from financing structure.

Edition and access
1999 · Accessed 2026-10-10
Locator
Glossary: Debt Service Coverage Ratio; Economic Viability
Support boundary
Historical institutional primer. Its market observations are not used as contemporary statistics.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

green-book

The Green Book

HM Treasury

Sets a UK public appraisal framework that separates objectives, option development, costs, benefits and uncertainty.

Edition and access
5 February 2026 · Accessed 2026-10-10
Locator
Options appraisal; risk and uncertainty; monitoring and evaluation
Support boundary
Its social appraisal perspective and public discount conventions do not automatically apply to private finance.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

aqua-book

The AQuA Book

UK Government Analysis Function

Provides a framework for producing and assuring decision-relevant analysis, including verification and validation.

Edition and access
current edition accessed 2026-10-10 · Accessed 2026-10-10
Locator
Quality assurance of analysis
Support boundary
A quality framework is not a certification of a particular model. Evidence of executed checks is still required.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

orange-book

The Orange Book: Management of Risk, Principles and Concepts

HM Treasury

Integrates risk with governance, objectives, treatment, monitoring and informed decisions while allowing context-specific arrangements.

Edition and access
29 July 2026 · Accessed 2026-10-10
Locator
Part I principles; Part II risk control framework
Support boundary
UK central government requirements are described in their scope. They are not asserted as duties for every organisation.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

gao-schedule

Schedule Assessment Guide: Best Practices for Project Schedules

US Government Accountability Office

Explains reliable schedules as integrated models of work and dependencies and relates slippage to lifecycle cost.

Edition and access
GAO-16-89G, 22 December 2015 · Accessed 2026-10-10
Locator
Ten schedule best practices; schedule risk
Support boundary
A deterministic critical path is a model result. It is not a probabilistic completion guarantee.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

gao-cost

Cost Estimating and Assessment Guide

US Government Accountability Office

Provides a structured process for cost estimates, work breakdown, documented assumptions, uncertainty and earned-value management.

Edition and access
GAO-20-195G, 12 March 2020 · Accessed 2026-10-10
Locator
Technical baseline; assumptions; sensitivity; update with actuals
Support boundary
An earned-value metric cannot repair an invalid baseline or prove the quality of completed work.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-cash-flow

IAS 7 Statement of Cash Flows

IFRS Foundation

Distinguishes cash-flow reporting from accrual performance and supplies the standard's publication history.

Edition and access
current issued-standard overview accessed 2026-10-10 · Accessed 2026-10-10
Locator
Operating, investing and financing cash-flow categories
Support boundary
Management contribution measures are not asserted to be IFRS-defined measures. Applicable amendments and effective dates must be checked for a real reporting entity.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

oecd-infrastructure-governance

Infrastructure governance

Organisation for Economic Co-operation and Development

Connects long-term infrastructure planning with needs, budget allocation, funding sources and coordination. Calls for evidence-based project selection and attention to public and user affordability.

Edition and access
live topic guidance accessed 2026-10-10 · Accessed 2026-10-10
Locator
Key messages: long-term strategic infrastructure planning; project selection and prioritisation
Support boundary
A public governance principle, not proof that a particular private asset is viable or financed. No regulatory requirement or score is inferred.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

oecd-infrastructure-resilience

Good Governance for Critical Infrastructure Resilience

Organisation for Economic Co-operation and Development

Explains that infrastructure interdependencies and multiple operators create resilience governance challenges. The report addresses approaches for protecting continuity of essential services.

Edition and access
2019 report, publisher abstract accessed 2026-10-10 · Accessed 2026-10-10
Locator
Publisher Executive summary, opening discussion of system interdependency, government-operator partnerships and continuity of essential services
Support boundary
The publisher abstract supports the report purpose only. It does not measure a project outage, quantify losses or certify operational resilience.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-government-guarantees

Government Guarantees

World Bank PPP Resource Center

Discusses the fiscal exposure created by government support and the need to balance support with prudent management of contingent obligations. Guarantee costs can be borne by the public sector or charged to the project.

Edition and access
live guidance accessed 2026-10-10 · Accessed 2026-10-10
Locator
Fiscal prudence; contingent liabilities; costs of guarantees
Support boundary
Conceptual public support guidance; no guarantee pricing, eligibility, legal enforceability or available facility is assumed for an actual project.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-guarantees

Guarantee Mechanisms in PPPs

World Bank PPP Resource Center

Describes different guarantee mechanisms and identifies unclear triggers, inadequate pricing and fiscal exposure as issues for design and management. Guarantees allocate specified risks rather than eliminating the underlying project event.

Edition and access
live guidance under publisher review, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Trigger mechanisms; fiscal exposure; guarantee scope
Support boundary
The page states that content is undergoing enhancement. Use is limited to conceptual design questions; current products, pricing and legal terms require separate confirmation.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-infrastructure-finance

Infrastructure Finance

World Bank PPP Resource Center

Distinguishes public, corporate and project financing. Explains that project finance relies on project cash flows and can require complex contracts and significant preparation. Financing choice depends on fiscal position, available finance and risk appetite.

Edition and access
live guidance accessed 2026-10-10 · Accessed 2026-10-10
Locator
Types of financing approaches; project financing complexity
Support boundary
No broad claim about off-balance-sheet treatment is adopted. The guide does not prove transaction feasibility or establish current market borrowing terms.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

wb-corridor-toolkit

Trade and Transport Corridor Management Toolkit

World Bank

Treats trade corridors as linked transport and administrative systems and offers diagnostic and governance methods.

Edition and access
2014 · Accessed 2026-10-10
Locator
Corridor performance; corridor components and institutions
Support boundary
Corridor context and measurement basis must be established locally; toolkit examples are not evidence for a new corridor.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-lpi-2023

Connecting to Compete 2023

World Bank

Explains the survey-based logistics index and complementary operational measures used in that edition.

Edition and access
2023 · Accessed 2026-10-10
Locator
Methodology and logistics dimensions
Support boundary
Do not equate perception scores with site capacity. This edition predates the redesigned LPI 2.0.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-lpi-current

About Logistics Performance Indicators 2.0

World Bank

The redesigned indicators use operational shipment data; prior editions relied on surveys of logistics operators.

Edition and access
2025 methodology, current page accessed 2026-10-10 · Accessed 2026-10-10
Locator
Methodology change
Support boundary
Edition comparisons require a bridge between methods. No unchanged time-series interpretation is assumed.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

unctad-rmt

Review of Maritime Transport

UN Trade and Development

Discusses policy uncertainty, geopolitical disruption and downside risks in the maritime trade outlook. The retained primary excerpt supports qualitative uncertainty mechanisms only.

Edition and access
2025 edition listed, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Chapter on international maritime trade: policy uncertainty and continued disruption
Support boundary
Direct full-report opening was unavailable. Use is limited to the exact cached primary excerpt; no market statistics, forecast quantity or full-report methodology is asserted.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

magenta-book

Magenta Book: Central Government guidance on evaluation

HM Treasury

Links evaluation design to decision needs, implementation and credible evidence of intervention effects.

Edition and access
15 May 2026 · Accessed 2026-10-10
Locator
Evaluation planning; test and learn; benefits management
Support boundary
A monitoring improvement is not by itself a causal impact estimate. Identification and context remain necessary.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nasa-se

NASA Systems Engineering Handbook

NASA

Connects decision context, alternatives, criteria, assumptions, uncertainty, evaluated results and recorded rationale.

Edition and access
NASA/SP-2016-6105 Rev 2, 2016 · Accessed 2026-10-10
Locator
Section 6.8 Decision Analysis; technical management processes
Support boundary
NASA engineering practice is a reference architecture. Transfer to a commercial organisation requires adaptation.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-lifecycle

Raising economic efficiency in view of life-cycle costs

World Bank

Connects construction, operations and maintenance costs over an infrastructure asset's life.

Edition and access
22 April 2024 · Accessed 2026-10-10
Locator
Quality Infrastructure Investment principle two
Support boundary
A lifecycle principle supplies no supplier-specific cost data or performance warranty.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wco-trs

Time Release Study Guide

World Customs Organization

Describes arrival-to-physical-release measurement, process mapping, sampling, segmentation and collaborative border performance improvement.

Edition and access
Version four, current page accessed October 2026 · Accessed 2026-10-10
Locator
Introduction and methodology enhancements
Support boundary
Institutional methodology supplies no release-time observation for the illustrative corridor.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

imo-jit

Just in Time Portal

International Maritime Organization

Coordinates ship arrival with berth, fairway and nautical service readiness and distinguishes administrative and operational timestamp data.

Edition and access
Current portal accessed October 2026 · Accessed 2026-10-10
Locator
Implementation; data categories; key timestamps
Support boundary
No emissions percentage or port-specific effect is imported; actual rights and service feasibility require local review.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

imo-facilitation

Facilitation

International Maritime Organization

Explains that ship and cargo formalities span health, revenue, security, immigration and restrictions, and that facilitation seeks harmonisation.

Edition and access
Current page accessed October 2026 · Accessed 2026-10-10
Locator
Government controls and facilitation overview
Support boundary
The overview is not a legal opinion on a particular port or proof of local implementation.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wto-tfa

Agreement on Trade Facilitation

World Trade Organization

The agreement addresses pre-arrival documentation procedures and cooperation between border agencies.

Edition and access
Legal text accessed October 2026 · Accessed 2026-10-10
Locator
Article seven, pre-arrival processing; Article eight, border agency cooperation
Support boundary
Applicability, member commitments and local implementation are jurisdiction-specific; no entitlement for an unnamed shipment is asserted.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

fhwa-reliability

Application of Travel Time Data and Statistics to Travel Time Reliability Analyses

US Federal Highway Administration

Distinguishes facility-based from end-to-end trip measures and explains how processing choices affect reliability measures.

Edition and access
Handbook chapter one, accessed October 2026 · Accessed 2026-10-10
Locator
Trip-Based Travel Time Reliability; Standard Processing Procedures
Support boundary
US road-method guidance transfers only as a measurement concept; no local freight variability estimate is assumed.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-port-governance

Port Reform Toolkit: Port Governance

World Bank

Explains the port authority role in reconciling stakeholder interests around strategic port performance.

Edition and access
Third edition, Module 3; retained 2025 publisher PDF, retrieved 2026-10-10 · Accessed 2026-10-10
Locator
Sections on port authorities as community builders and cooperation beyond local jurisdiction
Support boundary
The public module supports a governance architecture, not an executed arrangement or a local assignment of legal powers for this study.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

networkrail-capacity

Network Statement for the timetable year

Network Rail Infrastructure Limited

Separates network access conditions, train-path allocation, operating rules and connected service facilities in the infrastructure manager statement.

Edition and access
2026 Network Statement, retrieved October 2026 · Accessed 2026-10-10
Locator
General information and structure; capacity allocation; referenced engineering access and timetable planning rules
Support boundary
The Great Britain timetable and access framework is a scoped example, not a universal legal or technical requirement. No local train-path capacity is inferred.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

uk-mca

Multi-criteria analysis: a manual

UK Ministry of Housing, Communities and Local Government

Provides a practical framework for criteria, performance scoring, preference weights and sensitivity of option rankings.

Edition and access
January 2009 amendment to 2000 manual · Accessed 2026-10-10
Locator
Manual Chapter 6, scoring, swing weighting and sensitivity; full linked PDF retained locally.
Support boundary
Preference weights express judgment. They are not event probabilities or observed causal effects.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

magenta-methods

Magenta Book Annex A: analytical methods for use within an evaluation

HM Treasury

Describes methodological options for evaluation and the conditions required to interpret findings.

Edition and access
15 May 2026 · Accessed 2026-10-10
Locator
Analytical methods
Support boundary
Methods must match the available design and data. This paper does not imply that observational correlations establish causality.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-rated-criteria

Project Procurement: Rated Criteria

World Bank

Explains the use of disclosed rated non-price attributes alongside price and lifecycle cost in relevant Bank-financed procurement.

Edition and access
current guidance accessed 2026-10-10 · Accessed 2026-10-10
Locator
Price, lifecycle cost and non-price attributes
Support boundary
The mandatory scope belongs to World Bank-financed procurement and is not extended to unrelated tenders.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

oecd-composite

Handbook on Constructing Composite Indicators: Methodology and User Guide

OECD, European Commission Joint Research Centre

Composite-indicator construction involves scale choices, value judgements in weights and sensitivity checks.

Edition and access
2008 · Accessed 2026-10-10
Locator
Sections 1.5 to 1.7, printed pages 27 to 35; min-max discussion, printed page 85
Support boundary
Country benchmarking guidance informs methodological critique; it does not validate these project scores or measure their consequences.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ec-mcda-toolbox

Better Regulation Toolbox: Methodologies for analysing impacts

European Commission

Multi-criteria evaluation can retain diverse assessment dimensions when policy objectives cannot be reduced to monetary efficiency alone.

Edition and access
2023 · Accessed 2026-10-10
Locator
Tool 62, Main features and impact matrix, printed page 552
Support boundary
EU impact-assessment guidance is an analytical reference, not a private investment rule. No claim of a universal superiority of MCDA is adopted.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

oecd-board-functions

G20/OECD Principles of Corporate Governance: Responsibilities of the Board

OECD

Board responsibilities connect strategy and major expenditure oversight with risk governance and relevant information.

Edition and access
2023 · Accessed 2026-10-10
Locator
Principles V.D.1, V.D.2 and V.F; strategy, risk and access to information
Support boundary
The principles are policy guidance; actual duties and committee authority depend on the applicable corporate and legal framework.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

ifc-ps-one

Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts

International Finance Corporation

Environmental and social assessment belongs to project management and an explicit mitigation hierarchy.

Edition and access
2012 · Accessed 2026-10-10
Locator
Performance Standard 1, paragraphs 1,3,5 and7; introduction, mitigation hierarchy, management system and risk identification
Support boundary
The standard retains its IFC client and contractual scope. A weighted score cannot certify compliance or authorise trading away a requirement.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

eib-economic-appraisal

The Economic Appraisal of Investment Projects at the EIB, Second Edition

European Investment Bank

EIB economic appraisal considers value to society beyond investors financial profitability.

Edition and access
28 March 2023 · Accessed 2026-10-10
Locator
Publisher Description: economic appraisal beyond financial profitability
Support boundary
Only the publisher description is used here. It does not establish an economic value or appraisal result for an illustrative private proposal.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

omb-appraisal

Circular A-94: Guidelines and Discount Rates for Benefit-Cost Analysis of Federal Programs

US Office of Management and Budget

Federal appraisal guidance calls for stated assumptions, alternative means of meeting objectives and retrospective verification.

Edition and access
29 October 1992, current official index link accessed 2026-10-10 · Accessed 2026-10-10
Locator
Section 5.c(2) to (4): explicit assumptions, evaluation of alternatives and verification; physical PDF pages 5 and 6
Support boundary
Federal programme guidance retains its scope. No federal discount rate is imported into the preference model or prescribed to a private company.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hmt-business-case

Guidance on Developing Business Cases for Projects and Programmes

HM Treasury

Business-case guidance separates strategic, economic, commercial, financial and management perspectives on a spending proposal.

Edition and access
2026 · Accessed 2026-10-10
Locator
Chapter 2, printed pages 5 to 7; Chapter 8 longlist appraisal and Chapter 10 financial case
Support boundary
UK and Welsh public-spending requirements retain their stated scope. The analytical distinctions are adapted without asserting a duty for every firm.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nasa-ridm

NASA Risk-Informed Decision Making Handbook

National Aeronautics and Space Administration

Risk-informed choice combines performance measures and uncertainty within a deliberative decision process.

Edition and access
NASA/SP-2010-576, April 2010 · Accessed 2026-10-10
Locator
Sections 2 and 3: performance objectives, alternatives, risk analysis and deliberation
Support boundary
NASA direction-setting guidance is adapted as an analytical architecture. Its mission context does not establish project-specific commercial preferences.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

wb-procurement-criteria

Procurement Guidance: Evaluation Criteria

World Bank

Explains evaluation criteria and lifecycle cost when operation and maintenance can materially change value between bids.

Edition and access
2016 guidance · Accessed 2026-10-10
Locator
Life-cycle costing
Support boundary
Applicable procurement documents govern a tender. A generic cost example is not a legal award recommendation.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

doe-mv

Measurement and Verification for Federal Energy Savings Performance Contracts

US Department of Energy, FEMP

Links savings verification effort to performance risk, savings magnitude and project complexity.

Edition and access
current publication page accessed 2026-10-10 · Accessed 2026-10-10
Locator
Degree of measurement and verification
Support boundary
US federal contract requirements retain their stated scope; the analytical principle can be adapted without importing legal obligations.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

doe-mv-options

Measurement and Verification Options for Federal Energy- and Water-Saving Projects

US Department of Energy, FEMP

Distinguishes retrofit isolation, measured system parameters, whole-facility analysis and calibrated simulation approaches.

Edition and access
current publication page accessed 2026-10-10 · Accessed 2026-10-10
Locator
Options A, B, C and D
Support boundary
Measurement boundaries and interactions determine which approach is meaningful. A pre/post total alone is not automatically attributable savings.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

gds-open-standards

Make use of open standards

UK Government Digital Service

Explains standards, identifiers and approved sources as foundations for integration and avoidance of duplicated data.

Edition and access
31 March 2021 update · Accessed 2026-10-10
Locator
Approved data sources; identifiers; interoperability
Support boundary
An open standard does not by itself ensure semantic consistency, good implementation or viable exit.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-nist-lcc

Life Cycle Costing Manual for the Federal Energy Management Program

National Institute of Standards and Technology

Explains service boundaries, timed cost comparison and lifecycle economic measures for federal facility investments.

Edition and access
NIST Handbook 135e2025, August 2025 · Accessed 2026-10-10
Locator
Chapter 2 scope and study period; Chapter 3 discounting; Chapter 4 cost categories
Support boundary
Federal facility requirements and prescribed rates retain their own scope. Handbook examples are not current market quotations or this paper's inputs.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-sourcing

The Sourcing Playbook

UK Government Commercial Function

Relates service requirements, should-cost estimates and disclosed evaluation to whole-life value in public service sourcing.

Edition and access
HTML updated 30 September 2026 · Accessed 2026-10-10
Locator
Using Should Cost Model Estimates; Designing evaluation criteria; Cost versus quality
Support boundary
UK government guidance is a comparison reference. No threshold, mandatory procedure or legal duty is imported into an unrelated private tender.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-far-analysis

Proposal analysis techniques

US Federal Acquisition Regulation, Acquisition.gov

Distinguishes price analysis from cost analysis and examines the risk of unbalanced line-item pricing.

Edition and access
Online subsection 15.404-1 accessed 10 October 2026 · Accessed 2026-10-10
Locator
Paragraphs (b) price analysis, (c) cost analysis, (g) unbalanced pricing
Support boundary
The US federal rule has a specified institutional and acquisition scope. This study uses its analytical distinction, not a universal award procedure.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-abnormally-low

Identification and Treatment of Abnormally Low Bids and Proposals

World Bank

Uses focused clarification and supporting price analyses to investigate a potentially unsustainable bid.

Edition and access
Cover July 2016; imprint Published February 1, 2016, Second Edition · Accessed 2026-10-10
Locator
Printed pages 5 to 11; physical PDF pages 13 to 19: identify, clarify, justify, verify and decide
Support boundary
Guidance applies in its Bank procurement context. An unusually low price alone is not proof of an omission or supplier incapacity.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-risk-pricing

Risk Allocation and Pricing Approaches guidance note

UK Government Commercial Function

Connects risk allocation to pricing approach, payment mechanisms and management capability.

Edition and access
HTML updated 30 September 2026 · Accessed 2026-10-10
Locator
Overview; risk allocation; payment mechanisms and contractual terms
Support boundary
Public sourcing guidance supplies a conceptual reference. It does not determine a private contract's enforceability or a particular risk premium.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-digital-buy

The Digital, Data and Technology Playbook

UK Government Commercial Function

Links whole-life digital cost, tested evaluation criteria and delivery commitments retained in contracts and performance measures.

Edition and access
HTML edition accessed 10 October 2026 · Accessed 2026-10-10
Locator
Chapter 9 developing evaluation criteria: cost and quality; testing evaluation criteria
Support boundary
Its government digital-procurement policies retain their scope. No private platform benefit or exit-cost parameter is inferred from the guidance.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

proc-contract-management

Contract management principles

UK Government Commercial Agency

Connects procurement handover, explicit ownership, change control and performance records through the contract life.

Edition and access
HTML updated 12 December 2025 · Accessed 2026-10-10
Locator
Principles 1.1, 1.2, 1.6 and 1.7: handover, accountability, change and performance
Support boundary
Cross-government principles are adapted as management questions. Specific remedies and public-sector duties require their own contract and legal context.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

jackson-voi

A guide to value of information methods for prioritising research in health impact modelling

Christopher Jackson and coauthors; University of Cambridge repository

Connects information value to expected loss reduction under a specified decision and distinguishes perfect and sample information.

Edition and access
Epidemiologic Methods 10(1), 20210012; November 2021 · Accessed 2026-10-10
Locator
Sections 2 and 3; decision-theoretic expected loss and value of information
Support boundary
Authored tutorial in health-impact modelling. The paper here uses original illustrative commercial payoffs, not its empirical example or its broader algorithms.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

efsa-methods

EFSA Tutorial on Uncertainty: Overview of methods for Uncertainty Analysis

European Food Safety Authority

Explains structured uncertainty identification and the role, resource demands and bias controls of expert elicitation.

Edition and access
Public tutorial, accessed October 2026 · Accessed 2026-10-10
Locator
Methods for obtaining expert judgements; investigating influence and sensitivity
Support boundary
Food-safety assessment context. The inaccessible 2014 full guidance is not represented as read; this card cites the actual readable tutorial.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ipcc-uncertainty

Guidance Note for Lead Authors of the IPCC Fifth Assessment Report on Consistent Treatment of Uncertainties

IPCC Cross-Working Group Meeting

Distinguishes confidence in a finding from quantified likelihood and calls for explicit evaluation of evidence and agreement.

Edition and access
November 2010 · Accessed 2026-10-10
Locator
PDF pages 2-4; evidence, agreement, confidence and likelihood
Support boundary
Climate-assessment guidance for AR5 authors; not a universal calibration scale or an industrial probability estimate. Supporting material did not undergo formal IPCC review.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-measurement

Essentials of expressing measurement uncertainty: basic definitions

National Institute of Standards and Technology

Identifies measurement-process inputs and distinguishes statistical evaluation from other methods of evaluating measurement uncertainty.

Edition and access
NIST Technical Note 1297 companion, accessed October 2026 · Accessed 2026-10-10
Locator
Basic definitions; measurement equation; Type A and Type B evaluation
Support boundary
Metrology guidance; standard uncertainty is not a probability of commercial success or a general posterior model.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-risk-framing

Managing Information Security Risk: Organization, Mission, and Information System View

National Institute of Standards and Technology

Risk framing identifies assumptions, constraints, tolerance, priorities and trade-offs before risk assessment and response.

Edition and access
Special Publication 800-39, March 2011 · Accessed 2026-10-10
Locator
Section 3.1, printed pages 33-36; risk framing
Support boundary
Information-security and US federal institutional context; adaptation does not confer compliance or prescribe a financial loss function.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

sheffield-model-evidence

Reviewing model parameters: NICE Decision Support Unit technical support documents

University of Sheffield, NICE Decision Support Unit

Describes guidance on identifying, selecting and reporting evidence for model structure and parameters.

Edition and access
Public TSD 13 publisher description, accessed October 2026 · Accessed 2026-10-10
Locator
Publisher description of TSD 13, identifying and reviewing model evidence
Support boundary
Only the readable publisher description is used. The linked PDF was blocked in this retrieval and is not claimed read or paraphrased.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

doe-mv-plan

Measurement and Verification Activities Required in the Energy Savings Performance Contract Process

US Department of Energy, FEMP

Describes baseline definition, assumptions, reporting responsibilities, post-installation checks and annual verification.

Edition and access
current publication page accessed 2026-10-10 · Accessed 2026-10-10
Locator
M&V plan and baseline conditions
Support boundary
A baseline must be defended for the actual project. The cited process does not validate illustrative inputs.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

fda-test-reporting

Statistical Guidance on Reporting Results from Studies Evaluating Diagnostic Tests

US Food and Drug Administration

Defines sensitivity and specificity conditionally and requires interpretation in the intended population and study context.

Edition and access
Nonbinding guidance, March 2007 · Accessed 2026-10-10
Locator
Sections 3, 5 and 7.1; definitions and reporting context
Support boundary
Medical diagnostic-device reporting guidance only. It does not validate the hypothetical commercial signal, establish clinical advice or supply its likelihoods.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

nist-risk-assessment

Guide for Conducting Risk Assessments

US National Institute of Standards and Technology

Connects risk assessment preparation, execution and maintenance with organisational risk management.

Edition and access
SP 800-30 Revision 1, September 2012 · Accessed 2026-10-10
Locator
Prepare, conduct and maintain assessment
Support boundary
Information-system examples require adaptation outside that scope. Ordinal scales do not become quantitative probabilities through multiplication.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

gds-technology

The Technology Code of Practice

UK Government Digital Service

Connects government technology design, procurement and operation to business strategy and lifecycle choices.

Edition and access
30 January 2025 catalogue page · Accessed 2026-10-10
Locator
Technology and business strategies; lifecycle
Support boundary
Government spend-control scope is explicit. This paper presents adaptable operating principles rather than universal mandatory controls.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-govs

Government Functional Standard: Project Delivery

Government Project Delivery and Cabinet Office

Sets expectations for directing and managing government portfolios, programmes and projects, with planning, control and solution-delivery practices.

Edition and access
Current publisher page updated September 2025 · Accessed 2026-10-10
Locator
Standard purpose, structure and update record
Support boundary
UK government scope is retained; no universal enterprise duty or project acceptance is inferred.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-sro

The Role of the Senior Responsible Owner

Government Project Delivery and Cabinet Office

Identifies senior responsible ownership and its relationship to project leadership, sponsorship and accountable public roles.

Edition and access
Current public guidance page accessed October 2026 · Accessed 2026-10-10
Locator
Guidance purpose and intended governance roles
Support boundary
Government accountability arrangements require adaptation and do not assign an enterprise actor authority automatically.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-gate

Gate Review: Investment Decision

National Infrastructure and Service Transformation Authority

Provides scoped government guidance for assurance around an investment decision.

Edition and access
Current guidance page accessed October 2026 · Accessed 2026-10-10
Locator
Purpose of investment-decision assurance and applicable review arrangements
Support boundary
An assurance review is not an author-issued certificate or a substitute for local approval and evidence.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-doe-schedule

Planning and Scheduling

US Department of Energy

Connects requirements, scope, products, activities, resources and integrated scheduling within DOE capital project practice.

Edition and access
DOE Guide dated April 2022 · Accessed 2026-10-10
Locator
Integrated planning, master schedules, baseline and control practices
Support boundary
Historical guide scope is explicit; applicable current DOE requirements are not asserted for an unnamed enterprise project.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-doe-evm

Earned Value Management

US Department of Energy Office of Project Management

Describes EVM as integration and measurement of scope, cost and schedule accomplishments.

Edition and access
Current page accessed October 2026 · Accessed 2026-10-10
Locator
About earned value management
Support boundary
The definition supplies no accepted-work evidence or validation of a particular baseline; no EVM result is computed by the companion app.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-doe-lexicon

Project Management Lexicon of Terms

US Department of Energy

Defines traceability through integrated master schedule precedence and successor relationships.

Edition and access
Current public lexicon accessed October 2026 · Accessed 2026-10-10
Locator
Traceability and project-control terms
Support boundary
A terminology reference supplies no actual dependency, task duration or completion guarantee.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-gao-agile

Agile Assessment Guide

US Government Accountability Office

Discusses requirement refinement, traceability, validation and adapted monitoring in Agile programs.

Edition and access
GAO public guide, September 2020 · Accessed 2026-10-10
Locator
Requirements management and program monitoring chapters
Support boundary
Software and public-program context is retained; adaptive practice does not erase physical or contractual dependencies.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

delivery-discovery

How the Discovery Phase Works

UK Government Digital Service

Advises understanding a service problem and its constraints before committing to a solution; stopping can be an appropriate discovery outcome.

Edition and access
Current service manual page accessed October 2026 · Accessed 2026-10-10
Locator
Understanding the problem, constraints and deciding whether to continue
Support boundary
Digital-service scope is retained and no discovery duration or effect is imported.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ghg-corporate

Corporate Accounting and Reporting Standard

GHG Protocol, WRI and WBCSD

Provides corporate inventory principles and boundaries for greenhouse-gas accounting.

Edition and access
revised edition 2004, current publication page · Accessed 2026-10-10
Locator
Organisational and operational boundaries
Support boundary
Inventory accounting differs from project avoided-emissions claims. A simple energy model is not a verified corporate inventory.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ghg-scope2

Scope 2 Guidance

GHG Protocol, WRI and WBCSD

Addresses emissions accounting for purchased electricity, heat, steam and cooling and the quality of contractual instruments.

Edition and access
2015 guidance; revision consultation disclosed on current page · Accessed 2026-10-10
Locator
Purchased electricity; location and market basis
Support boundary
The active revision process is disclosed. This edition does not assume the consultation has replaced the published standard.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

iea-efficiency-industry

Energy Efficiency 2025: Industry

International Energy Agency

Describes industrial energy uses and efficiency levers including motors, process optimisation, material efficiency and electrification of lower-temperature heat.

Edition and access
20 November 2025 · Accessed 2026-10-10
Locator
Energy uses; industrial efficiency measures
Support boundary
Sector descriptions do not establish savings for a particular site. Site balances, baselines and load profiles are needed.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

doe-mv-v5

M&V Guidelines: Measurement and Verification for Performance-Based Contracts, Version 5.0

US Department of Energy, FEMP

Supplies the current listed FEMP procedure edition for verifying energy and cost savings under performance contracts.

Edition and access
14 October 2024 · Accessed 2026-10-10
Locator
Version and procedure scope
Support boundary
Guideline adoption and project-specific compliance are separate questions.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ghg-project

The GHG Protocol for Project Accounting

GHG Protocol, World Resources Institute and WBCSD

Project accounting requires an assessment boundary, baseline procedure and monitored reduction.

Edition and access
2005, retained published protocol; update disclosed by publisher · Accessed 2026-10-10
Locator
Chapter 5 assessment boundary; Chapter 6 selecting a baseline procedure, printed pages 36 to 37; Chapter 10 monitoring
Support boundary
Project accounting is distinct from corporate inventory. The protocol does not establish ownership, programme acceptance or credit eligibility for these illustrative measures.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ghg-avoided

Estimating and Reporting the Comparative Emissions Impacts of Products

World Resources Institute, GHG Protocol

Comparative impacts and inventories use different methods; equivalent function matters in product comparisons.

Edition and access
Working paper, January 2019 · Accessed 2026-10-10
Locator
Key principles, printed page 3; functional unit, printed page 5
Support boundary
This is a working-paper framework, not exhaustive detailed guidance or a replacement inventory standard. No product impact is measured here.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

epa-egrid

eGRID2023 Technical Guide

US Environmental Protection Agency

Electricity emissions-rate data have specified generation, aggregation and application bases.

Edition and access
January 15, 2025 · Accessed 2026-10-10
Locator
Section 2.3 applications, printed page 4; Section 3.1.3.3 emission rates, printed pages 19 to 20
Support boundary
US historical generation data do not supply a factor for an unspecified facility or an international forecast. No eGRID numerical factor is imported into the fixtures.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

epa-avert

AVERT User Manual, Version 4.3

US Environmental Protection Agency

Emissions-change modelling can require temporal information beyond a basic annual factor calculation.

Edition and access
April 2024 · Accessed 2026-10-10
Locator
Introduction, printed pages 4 to 6; overview of temporally resolved emissions-change modelling
Support boundary
AVERT retains its US electric-system and methodological scope. This paper does not run AVERT, estimate marginal dispatch or certify a consequential reduction.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

doe-process-heat

Process Heat Basics

US Department of Energy, Industrial Technologies Office

Process heat supplies thermal energy to treat or alter manufactured material.

Edition and access
Live official explanatory page, accessed 2026-10-10 · Accessed 2026-10-10
Locator
Opening definition and description of heat transfer to materials
Support boundary
An explanatory process description does not establish an equipment efficiency, operating duty, temperature requirement or verified fuel-switch benefit.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-si

The International System of Units (SI), NIST Special Publication 330

US National Institute of Standards and Technology

Energy and power are distinct quantities with distinct units.

Edition and access
2019 edition · Accessed 2026-10-10
Locator
Section 2.3.4 and Table 4, printed page 15; SI derived units energy and power
Support boundary
The retained published edition supports the unit distinction. No equipment duty or transition performance parameter follows from a unit definition.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ipcc-industry

Climate Change 2022: Mitigation of Climate Change, Chapter 11 Industry

Intergovernmental Panel on Climate Change

Industrial efficiency and carrier switching depend on process and energy-supply conditions.

Edition and access
AR6 Working Group III, 2022; official readable chapter page · Accessed 2026-10-10
Locator
Sections 11.3.4 Energy Efficiency and 11.3.5 Electrification and Fuel Switching
Support boundary
The assessment concerns broad mechanisms. No global potential, sector average or cited numerical factor is adopted as a project parameter.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ghg-updates

GHG Protocol Announces Key Standard Development Updates: FAQ Resource

GHG Protocol

The announced harmonisation remains a development process; distinct reporting statements are discussed.

Edition and access
July 29, 2026 announcement · Accessed 2026-10-10
Locator
Questions on consolidated standard development and separate inventory, contractual and action-impact reporting
Support boundary
A development announcement is not an issued replacement standard. Current published guidance, future proposals and programme requirements must be distinguished.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

doe-mv-guidelines

M&V Guidelines: Measurement and Verification for Performance-Based Contracts

US Department of Energy, Federal Energy Management Program

Savings comparison, responsibility allocation and method selection require a project-specific verification design.

Edition and access
Version 5.0, September 2024 published PDF · Accessed 2026-10-10
Locator
Section 2.1.1, printed pages 3 to 4; Section 3, printed pages 13 to 14; Section 4.1, printed pages 18 to 19; Section 5, printed pages 40 to 43
Support boundary
The published performance-contract framework informs method and responsibility design. It does not validate fictional inputs, an actual contract or realised savings.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

gds-data-ownership

Data ownership model

UK Government

Places accountability for the meaning, quality and management of data with business ownership and distinguishes operational roles.

Edition and access
current edition accessed 2026-10-10 · Accessed 2026-10-10
Locator
Business ownership; accountability for meaning and quality
Support boundary
Business ownership terminology is not a transfer of legal title or a replacement for applicable privacy responsibilities.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-csf

The NIST Cybersecurity Framework 2.0

US National Institute of Standards and Technology

Frames cybersecurity outcomes around governance and management of enterprise risk.

Edition and access
26 February 2024 · Accessed 2026-10-10
Locator
Govern function; profiles; outcomes
Support boundary
A framework is not proof that controls operate effectively or that all threats are covered.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

iia-three-lines

Statements of Position: Three Lines Model

Institute of Internal Auditors

Describes governing-body accountability, management roles and independent internal assurance, with safeguards where roles overlap.

Edition and access
8 July 2026 refreshed statement · Accessed 2026-10-10
Locator
Three Lines Model; independence safeguards
Support boundary
The earlier position paper is marked superseded. This research uses the refreshed statement and avoids assuming role labels prove independence.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-data-quality

The Government Data Quality Framework

UK Government Data Quality Hub

Distinguishes completeness, uniqueness, consistency, timeliness, validity and accuracy for assessing data quality.

Edition and access
Current public framework accessed October 2026 · Accessed 2026-10-10
Locator
Data quality dimensions and fitness for purpose
Support boundary
UK public-sector guidance; dimensions do not establish a private dataset quality score or guarantee.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-reliable-service

Service Standard point 14: Operate a reliable service

UK Government Digital Service

Connects service reliability, monitoring and quality assurance with users completing their intended tasks.

Edition and access
Current public service standard accessed October 2026 · Accessed 2026-10-10
Locator
What the service team should do and why it matters
Support boundary
Government service standard; no contractual service level, universal uptime target or certification is inferred.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-service-metrics

How to set performance metrics for your service

UK Government Digital Service

Relates service purpose and intended benefits to metrics, data sources and contextual interpretation.

Edition and access
Current service manual accessed October 2026 · Accessed 2026-10-10
Locator
Purpose, hypotheses, measurement and interpretation
Support boundary
Government service context; mandatory public-service indicators are not imposed on an unnamed industrial operator.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-incident-response

Incident Response Recommendations and Considerations for Cybersecurity Risk Management: A CSF 2.0 Community Profile

US National Institute of Standards and Technology

Integrates incident response considerations into cybersecurity risk management through CSF 2.0.

Edition and access
NIST SP 800-61 Rev. 3, April 2025 final publication · Accessed 2026-10-10
Locator
Executive summary and incident response across risk management
Support boundary
Final revision guidance; no incident probability, control effectiveness or enterprise conformity is established.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-privacy

NIST Privacy Framework

US National Institute of Standards and Technology

Presents a voluntary framework for identifying and managing privacy risk.

Edition and access
Publisher landing page accessed October 2026; PF 1.1 is explicitly an Initial Public Draft · Accessed 2026-10-10
Locator
Framework purpose and voluntary risk management use
Support boundary
A risk management resource does not determine applicable law, lawful processing or legal compliance. The landing page advertises an Initial Public Draft; no final 1.1 standard is asserted.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

digital-accessibility

Web Content Accessibility Guidelines (WCAG) 2.2

World Wide Web Consortium

Provides technical accessibility success criteria and explicit conformance requirements.

Edition and access
W3C Recommendation, 12 December 2024; live latest published URL accessed October 2026 · Accessed 2026-10-10
Locator
Introduction, success criteria and conformance requirements
Support boundary
The Recommendation is distinct from editor drafts; citing criteria does not certify a service or establish jurisdictional legal compliance.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-risk-scenarios

Identifying and Estimating Cybersecurity Risk for Enterprise Risk Management

NIST

Cybersecurity scenarios connect assets, threats, vulnerabilities and consequences; detail records support the register.

Edition and access
NIST IR 8286A Rev. 1, December 2025; supersedes November 2021 edition · Accessed 2026-10-10
Locator
Section 2.2, printed pages 23 to 24; Section 2.2.4 printed 42 to 43; Appendix B printed 66
Support boundary
Cybersecurity and enterprise-risk guidance supplies a scenario structure, not the empirical probabilities or control-performance assumptions of this paper.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-business-impact

Using Business Impact Analysis to Inform Risk Prioritization and Response

NIST

Business impact analysis relates protected assets to mission functions and leadership risk direction.

Edition and access
NIST IR 8286D-upd1, February 2025; supersedes November 2022 edition · Accessed 2026-10-10
Locator
Section 2.2, printed pages 6 to 8; asset dependence on mission and leadership direction
Support boundary
The ICT guidance does not value an actual industrial asset, establish an outage tolerance or implement a joint loss distribution here.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-enterprise-ict

Enterprise Impact of Information and Communications Technology Risk

NIST

Information-technology risk needs enterprise context and coordination beyond isolated system reports.

Edition and access
NIST SP 800-221, November 2023 · Accessed 2026-10-10
Locator
Executive Summary, printed page 3 (PDF page 14), Figure 1 and register/profile discussion; Sections 2.4.3 to 2.4.6, printed pages 15 to 16; Sections 3.1 and 3.1.1, printed pages 17 to 18 (PDF pages 28 to 29), enterprise context and governance
Support boundary
The governance framework retains its ICT scope. This study extends a stated mechanism conceptually; it does not infer observed effectiveness from guidance.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

iia-lines-full-2026

Three Lines Model: Assurance and Advice in Support of Effective Governance

The Institute of Internal Auditors

Independent assurance requires structural safeguards and access; coordination does not erase distinct responsibilities.

Edition and access
Statement of Position, July 2026 · Accessed 2026-10-10
Locator
Independence, printed 9; Three Lines Model comparison, printed 13 to 14
Support boundary
Professional position guidance is not a statutory mandate. No actual audit charter, board delegation or assurance acceptance is represented.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

iia-erm-full-2026

The Role of the Internal Audit Function in Enterprise Risk Management

The Institute of Internal Auditors

Management owns risk responses; internal audit provides assurance and advice with appropriate safeguards.

Edition and access
Statement of Position, July 2026 · Accessed 2026-10-10
Locator
Governance-system roles printed 7; activities and management decisions printed 8; integrated assurance printed 19 to 20
Support boundary
The statement does not delegate risk acceptance to this fictional committee, approve self-review or supply an institution-specific assurance opinion.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

nist-ai-rmf

Artificial Intelligence Risk Management Framework: AI RMF1.0

NIST

AI risk tolerance depends on context; governance informs risk work throughout the lifecycle.

Edition and access
NIST AI100-1, January 2023, published framework · Accessed 2026-10-10
Locator
Section 1.2.2 printed 7; Section 5.1 Govern printed 21 to 22
Support boundary
The voluntary framework concerns AI systems. The risk app is an arithmetic demonstrator, not an AI-risk assessment, compliance certificate or universal tolerance standard.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-revenue

IFRS 15 Revenue from Contracts with Customers

IFRS Foundation

Defines the standard's objective for information about the nature, timing, amount and uncertainty of contract revenue and cash flows.

Edition and access
current issued-standard overview accessed 2026-10-10 · Accessed 2026-10-10
Locator
Revenue and cash-flow timing and uncertainty
Support boundary
The overview is cited only for the standard's purpose. Applying recognition rules needs the full applicable standard and specific facts.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

sec-nongaap

Non-GAAP Financial Measures: Compliance and Disclosure Interpretations

US Securities and Exchange Commission, Division of Corporation Finance

Explains why inconsistent adjustments, unclear labels or misleading exclusions can distort non-GAAP measures. Free cash flow lacks a uniform definition.

Edition and access
13 December 2022 latest listed update · Accessed 2026-10-10
Locator
Questions 100.01, 100.02, 100.05 and 102.07
Support boundary
SEC interpretations retain their US registrant scope. This paper adapts a transparency principle, without implying every private management metric is regulated identically.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

sec-manual

Financial Reporting Manual: Topic 8

US Securities and Exchange Commission

Distinguishes non-GAAP financial measures from some operating statistics and explains presentation context.

Edition and access
current staff manual accessed 2026-10-10 · Accessed 2026-10-10
Locator
Sections 8120.1 and 8120.3: definition and operating/statistical measures; primary page last reviewed or updated November 26, 2024
Support boundary
This is staff guidance and references historical update dates. It does not substitute for current rules or professional accounting assessment.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

sba-breakeven

Plan your business: break-even analysis

US Small Business Administration

Defines unit break-even as fixed cost divided by unit price less unit variable cost.

Edition and access
current publication page accessed 2026-10-10 · Accessed 2026-10-10
Locator
Break-even analysis: Getting started; Tips and tricks, single-product assumption and fixed cost divided by price less variable cost
Support boundary
The formula assumes a defined relevant range, cost behaviour and contribution basis. Multi-product mix and capacity steps need additional modelling.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hardie-timing

Reconciling and Clarifying CLV Formulas

Peter S. Fader and Bruce G. S. Hardie

Customer-value formulas depend on first-payment inclusion and the timing of periodic cash flows.

Edition and access
March 2012 author note · Accessed 2026-10-10
Locator
Section 2, printed pages 2 to 4, inclusion of first contribution and beginning versus end of period
Support boundary
No numerical parameter is imported. This paper uses a finite contribution window and a separate working-capital proxy, not the note’s infinite cash-flow formulas.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hardie-truncation

What’s Wrong With This CLV Formula?

Peter S. Fader and Bruce G. S. Hardie

Expected customer value, finite truncation and contractual retention require explicit interpretation.

Edition and access
December 2014 author note · Accessed 2026-10-10
Locator
Issues 1 to 5, printed pages 1 to 4; note 4, printed pages 5 to 6
Support boundary
The Growth engine is a homogeneous illustrative mechanism; it estimates no customer lifetime distribution, age-dependent churn or empirical response.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hardie-heterogeneity

Customer-Base Valuation in a Contractual Setting: The Perils of Ignoring Heterogeneity

Peter S. Fader and Bruce G. S. Hardie, Marketing Science

Retention aggregation can obscure cohort dynamics and underlying heterogeneity.

Edition and access
2010, volume 29, pages 85 to 93, author-hosted published reprint · Accessed 2026-10-10
Locator
Introduction and exploratory analysis, printed pages 85 to 87
Support boundary
The published example and numerical findings are not reproduced or adopted as market evidence. Heterogeneity is a model escalation criterion here, not an implemented estimator.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hardie-retention

How to Project Customer Retention

Peter S. Fader and Bruce G. S. Hardie

A contractual-retention model needs a stated behavioural process, beyond a fitted time curve.

Edition and access
May 2006 author manuscript · Accessed 2026-10-10
Locator
Abstract and introduction, PDF pages 2 to 4; probability model motivation
Support boundary
No shifted-beta-geometric fitting or forecasting is implemented. This source motivates data/model escalation, without supplying the fixture churn assumptions.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

hardie-noncontractual

Customer-Base Analysis in a Discrete-Time Noncontractual Setting

Peter S. Fader, Bruce G. S. Hardie and Jen Shang, Marketing Science

In noncontractual settings, a purchasing hiatus does not identify permanent customer dropout.

Edition and access
2010, volume 29, pages 1086 to 1108, author-hosted published reprint · Accessed 2026-10-10
Locator
Introduction, printed pages 1086 to 1088, discrete buying and unobserved dropout
Support boundary
No donation data, empirical result or BG/BB fitting is imported. Subscription-like fixture survival must not be substituted for repeat-purchase inference.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

sec-kpi

Commission Guidance on Management’s Discussion and Analysis: Key Performance Indicators and Metrics

US Securities and Exchange Commission

Material metrics need clear definitions, use, assumptions and controlled methodological changes.

Edition and access
Release 33-10751, January 30, 2020 · Accessed 2026-10-10
Locator
Section I, printed pages 3 to 5, definitions, use, assumptions, changes and disclosure controls
Support boundary
US MD&A guidance retains its registrant/reporting scope. The internal decision protocol is an original adaptation, not a finding that all private dashboards have identical legal requirements.
Retrieval record
browser-retrieved
Open original public source

Linked claim locations load when this card opens.

irs-timing

Publication 538: Accounting Periods and Methods

US Internal Revenue Service

Cash and accrual tax methods recognise income and expenses on different timing bases.

Edition and access
January 2022 retained edition · Accessed 2026-10-10
Locator
Introduction; Accounting Methods; Cash Method and Accrual Method sections
Support boundary
US taxpayer guidance does not define IFRS revenue or make the illustrative contribution ledger a tax return. No tax rule is applied to a real entity.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

occ-working-assets

Accounts Receivable and Inventory Financing, Comptroller’s Handbook

US Office of the Comptroller of the Currency

Working-asset financing requires attention to the operating cycle, collateral quality and administration.

Edition and access
March 2000 booklet with March 20, 2025 reputation-risk reference changes · Accessed 2026-10-10
Locator
Assessing the Borrower’s Operating Cycle, printed pages 15 to 17; Evaluating Collateral, printed pages 17 to 22
Support boundary
Bank-supervision guidance is used for a narrow diligence distinction. No borrowing-base eligibility, bank advance rate or approved facility is calculated.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-supplier-finance

IASB increases transparency of companies’ supplier finance

IFRS Foundation, International Accounting Standards Board

Supplier-finance disclosures address liabilities, cash flows and exposure to liquidity risk.

Edition and access
May 25, 2023 announcement · Accessed 2026-10-10
Locator
Opening paragraphs and disclosure information on terms, amounts and due-date ranges
Support boundary
This announcement describes amendments, not the full application of the standards. The fictional extended-payables gate requires evidence independently of any accounting conclusion.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-inventory

IAS 2 Inventories: issued-standard overview

IFRS Foundation

Inventory measurement and expense recognition have accounting bases distinct from a simple days proxy.

Edition and access
Publisher overview accessed 2026-10-10 · Accessed 2026-10-10
Locator
About section, costs, expense recognition and net realisable value
Support boundary
The overview is used narrowly; the app’s variable-cost inventory proxy is not asserted to be an IAS 2 valuation or a stock impairment calculation.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-credit

IFRS 9 Financial Instruments: issued-standard overview

IFRS Foundation

The issued standard includes impairment requirements for expected credit losses.

Edition and access
Publisher overview accessed 2026-10-10 · Accessed 2026-10-10
Locator
Standard history, July 2014 addition of expected-credit-loss impairment requirements
Support boundary
No expected-credit-loss provision, credit model or contractual classification is calculated. The overview cannot replace the full standard or facts of a real receivable.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-performance

IFRS 18 Presentation and Disclosure in Financial Statements: overview

IFRS Foundation

The issued standard addresses specified public management-defined subtotals and financial statement presentation.

Edition and access
Issued April 2024; publisher overview accessed 2026-10-10 · Accessed 2026-10-10
Locator
About section, effective date and management-defined performance measures
Support boundary
The overview states an effective date for annual periods beginning in 2027. It is not treated as already mandatory for every entity or as governing all operational ratios.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

sba-startup-costs

How to Estimate Starting Costs

US Small Business Administration, Tim Berry

Startup estimates include expenses, noncash assets and opening cash for early operating deficits.

Edition and access
January 6, 2017 publisher-authored explanatory article · Accessed 2026-10-10
Locator
Three essential estimates and paragraph on cash for early operating deficits
Support boundary
The explanatory article supplies no sector parameter, reliable forecast or financing availability. Published hypothetical figures are not imported.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

sba-finance

Manage your business: finances and marketing

US Small Business Administration

Bookkeeping, cash projection and marketing-budget review support connected business planning.

Edition and access
Official readable guidance accessed 2026-10-10 · Accessed 2026-10-10
Locator
Manage your finances: balance sheet and accounting methods; Marketing and sales: budget and performance comparison
Support boundary
Small-business explanatory guidance is not an accounting standard, causal marketing-response model or approval of the fixture assumptions.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

ifrs-channel

IFRIC Update April 2022: Principal versus Agent, Software Reseller

IFRS Foundation, IFRS Interpretations Committee

Principal-agent assessment considers control and the relevance of indicators within the specified fact pattern.

Edition and access
April 2022 committee update · Accessed 2026-10-10
Locator
Principal versus Agent: Software Reseller section; assessing control and relevance of indicators
Support boundary
The agenda-decision reasoning concerns a submitted software-reseller arrangement. It does not decide the accounting for a fictional channel or establish economic incidence in every industry.
Retrieval record
retrieved
Open original public source

Linked claim locations load when this card opens.

Find the next connection

Open the full search desk