Locate the binding stage, expose stranded expansion and price the whole chain.
Corridor / continuityIllustrative composition
The interactive model requires JavaScript. This saved default illustration remains readable if the runtime is unavailable. Values are computed from the canonical model at build time; they describe fictional inputs, with full calculation precision.
ICM · Corridor lab · Model 1.1.0 · Default illustrative record
Default illustrative result
The binding stage is Rail corridor. A 20% expansion of Rail corridor creates the largest tested gain of 0.1 Mt/year. Availability stress changes flow to 10.5 Mt/year and unit cost to 24.76 USD/t.
| Metric | Value | Unit | Calculation boundary |
|---|---|---|---|
| Deliverable throughput | 11.9 | Mt/year | |
| Whole-chain cost | 23.73109243697479 | USD/t | All stages use the same chain throughput. |
| Unserved demand | 0.1 | Mt/year | |
| Availability stress | 10.5 | Mt/year | Each availability falls by 10 percentage points. |
| Stage | NominalMt/year | EffectiveMt/year | Utilisation% | SpareMt/year | Stage costUSD/t | Annual costUSDm | Constraint |
|---|---|---|---|---|---|---|---|
| Mine release | 18 | 16.2 | 73.45679012345678 | 4.3 | 3.576470588235294 | 42.56 | Spare |
| Rail corridor | 14 | 11.9 | 100 | 0 | 11.129411764705882 | 132.44 | Binding |
| Port stockyard | 16 | 14.4 | 82.63888888888889 | 2.5 | 4.480672268907563 | 53.32 | Spare |
| Vessel loading | 15 | 12 | 99.16666666666667 | 0.1 | 4.54453781512605 | 54.080000000000005 | Spare |
| Expanded stage | New effective capacityMt/year | Chain flowMt/year | Flow gainMt/year | Next constraint |
|---|---|---|---|---|
| Mine release | 19.44 | 11.9 | 0 | Rail corridor |
| Rail corridor | 14.28 | 12 | 0.1 | Demand |
| Port stockyard | 17.28 | 11.9 | 0 | Rail corridor |
| Vessel loading | 14.4 | 11.9 | 0 | Rail corridor |
Inputs behind this result
| Assumption and unit | Exact supplied value |
|---|---|
| Annual demand (Mt per year) | 12 |
| Stage | Nominal capacityMt/year | Availability% | Variable costUSD/t | Annual fixed costUSDm |
|---|---|---|---|---|
| Mine release | 18 | 90 | 2.4 | 14 |
| Rail corridor | 14 | 85 | 7.6 | 42 |
| Port stockyard | 16 | 90 | 2.8 | 20 |
| Vessel loading | 15 | 80 | 3.2 | 16 |
Transparent method
- Effective stage capacity = nominal capacity × availability.
- Serial throughput = minimum of demand and effective stage capacities.
- Chain unit cost = sum of variable cost + sum of annual fixed cost / actual annual throughput. USDm divided by Mt gives USD/t.
- Each expansion case increases one nominal capacity by 20%; availability stress reduces every stage by 10 percentage points.
- Capacity products, throughput, demand gaps and constraint membership use exact rational arithmetic for each canonical decimal input; plotted quantities and costs use numeric approximations.
Limits
- Steady-state serial system, with no routing alternatives, queues, seasonality, dispatch or inventory simulation.
- Availability and cost values are user assumptions. No geographic or actual operating project is represented.
- Exactness applies to the supplied canonical decimal values, not their empirical accuracy. Annual cost and display calculations retain floating-point precision.
- Numerical input precision: use zero or absolute values of at least 0.000000001. Smaller nonzero inputs are rejected explicitly.